Skip to content
BeauVi district, Fribourg, general view
General view of the district, the two towers and the slabs along the park · rendering · © Mullerarchitecte (MPMA)
A.1

BeauVi.

350 rental apartments, Beaumont–Vignettaz district, Fribourg

My role
Project manager, planning
SIA phases 41 · 51
2025–2026

A district of five buildings, from the BE2 tower to the GL9 and GL11 slabs, delivered by a general contractor. Within the architects’ consortium in charge of construction documents, I ran the deliverables schedule and coordination with the general contractor and its consultants.

LocationLocation
Location
Fribourg (FR)
Programme
350 rental apartments, shops, parking
Cost
100 M CHF
General contractor
EDIFEA SA
Architect
MPMA
Construction phase
FPA3: Fahrny & Partenaires, Atelier A3
Role
Project manager, planning
Period
2025–2026
SIA 112 phases

305 documents, three producers, one schedule.

Plans, sections, elevations and construction details, split between Fahrny & Partenaires, Atelier A3 and the general contractor. For each: preliminary issue, final issue, client approval, structural engineer’s needs. The schedule was realigned every week to progress on site.

305Construction drawings
48Location plans
3Producers, one schedule
5Buildings coordinated
  • Preliminary deliverables
  • Final deliverables
  • Client approvals
  • Structural engineer’s needs
  • Fahrny & Partenaires
  • Atelier A3
  • Edifea
m1m2m3m4m5m6m7m8m9m10m11m12year 2m14m15100200300353Cumulative progressdocuments, by milestoneSchedule by packagebuilding · phase181 deliverablesin the busiest weekSite-wide · basementsSIA phase 41 · 13SIA phase 51 · 18Location plans · 6BE2 · towerSIA phase 41 · 29SIA phase 51 · 39Location plans · 7GR15 · towerSIA phase 41 · 25SIA phase 51 · 34Location plans · 7GL9SIA phase 41 · 42SIA phase 51 · 55Location plans · 14GL11SIA phase 41 · 19SIA phase 51 · 31Location plans · 14

1124 milestones tracked584 deliverables in 10 months9 wk from preliminary to final (median)4 wk until approval (median)

Time counted in months from the launch of the schedule, kept and readjusted every week · based on the construction drawing list

Exterior landscaping plan
Exterior landscaping plan, tender documents · © Mullerarchitecte (MPMA)
Level 4, overall plan
Level 4, overall plan, tender documents · © Mullerarchitecte (MPMA)
BE2, typical floor plan
BE2, typical floor plan, tender documents · © Mullerarchitecte (MPMA)
GL11, floor plan
GL11, floor plan, pre-construction · © FPA3
GR15, section B
GR15, section B, pre-construction · © FPA3
GL11, section C
GL11, section C, pre-construction · © FPA3
GL9, annotated north elevation
GL9, north elevation, annotated optimisations (May 2024) · © Edifea
Full portfolio (PDF, 39 pp., in French)